BS PD IEC TS 62600-103:2018 w/corrigendum View larger

BS PD IEC TS 62600-103:2018 w/corrigendum

M00008270

New product

BS PD IEC TS 62600-103:2018 w/corrigendum Marine energy. Wave, tidal and other water current converters - Guidelines for the early stage development of wave energy converters. Best practices and recommended procedures for the testing of pre-prototype devices

standard by BSI Group, 06/30/2022

More details

In stock

$340.36

More info

Full Description

This part of IEC TS 62600 is concerned with the sub-prototype scale development of WECs. It includes the wave tank test programmes, where wave conditions are controlled so they can be scheduled, and the first large-scale sea trials, where sea states occur naturally and the programmes are adjusted and flexible to accommodate the conditions. A full-scale prototype test schedule is not covered in this document. Bench tests of PTO (power take-off) equipment are also not covered in this document.


All current amendments available at time of purchase are included with the purchase of this document.