Sale! View larger

IEEE C37.242-2013

New product

IEEE C37.242-2013 IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

standard by IEEE, 03/06/2013

More details

$76.12

-56%

$173.00

More info

Full Description

Scope

The document provides guidance for synchronization, calibration, testing, and installation of phasormeasurement units (PMUs) applied in power system protection and control. The following are addressed in this guide:a) Considerations for the installation of PMU devices based on application requirements and typicalbus configurations.b) Techniques focusing on the overall accuracy and availability of the time synchronization system.c) Test and calibration procedures for PMUs for laboratory and field applications.d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators(PDCs).

Purpose

This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and connection to other devices including PDCs.

Abstract

New IEEE Standard - Active.Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) Techniques focusing on the overall accuracy and availability of the time synchronization system; (c) Test and calibration procedures for PMUs for laboratory and field applications; (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

Product Details

Published: 03/06/2013 ISBN(s): 9781504415057, 9780738182957, 9780738182964 Number of Pages: 107File Size: 1 file , 2.1 MB Product Code(s): STD98172, STDPD98172, STDPL98172