Sale! View larger

API RP 1172

New product

API RP 1172 Recommended Practice for Construction Parallel to Existing Underground Transmission Pipelines, First Edition

standard by American Petroleum Institute, 04/01/2014

More details

$37.40

-56%

$85.00

More info

Full Description

Construction activities parallel to existing transmission pipelines, for any distance, are the focus of this recommended practice (RP). Activity of concern includes construction activity that could impact an existing facility, such as excavation or movement of equipment across the pipeline or within the easement that could affect the safe operation of the existing pipeline. This RP is intended as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. Contractors working on behalf of the constructing party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment, are encouraged to engage in work practices that are in conformance with these guidelines. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Product Details

Edition: 1st Published: 04/01/2014 ANSI: ANSI Approved Number of Pages: 19File Size: 1 file , 2.9 MB Product Code(s): D11721, D11721, D11721 Note: This product is unavailable in Cuba, Iran, North Korea, Syria