More info
Full Description
Covers recommended practices that specifically apply to instrument and control system installations for fired heaters and steam generation facilities in petroleum refinery and other hydrocarbon-processing plants. Also discusses the installation of primary measuring instruments, control systems, alarm and shutdown systems, and automatic start-up and shutdown systems for fired heaters, steam generators, carbon monoxide or was-gas steam generators, gas turbine exhaust-fired steam generators, and unfiredwaste heat steam generators. ALthough the information has been prepared primarily for petroleum refineries, much of it is applicable without change in chemical plants, gasoline plants, and similiar installations. Product Details
Edition: 2nd Published: 04/01/2011 ANSI: ANSI Approved Number of Pages: 40File Size: 1 file , 1.4 MBRedline File Size:2files, 2.8 MB Product Code(s): C55602, C55602, C55602 Note: This product is unavailable in Cuba, Iran, North Korea, Syria