Sale! View larger

ASME PCC-3-2007 (R2012)

New product

ASME PCC-3-2007 (R2012) Inspection Planning Using Risk-Based Methods, Includes Errata (2008)

standard by ASME International, 01/01/2008

More details

$40.92

-56%

$93.00

More info

Full Description

The risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressure-containing equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complimentary risk analysis approaches (qualitative through fully quantitative) should be considered as part of the inspection planning process.

Product Details

Published: 01/01/2008 ISBN(s): 9780791831281 ANSI: ANSI Approved Number of Pages: 88File Size: 1 file , 1.4 MB Product Code(s): A1680Q, A1680Q, A1680Q