A description of the Indian River County membrane softening plant, including operation and maintenance costs (energy, chemicals, membrane replacement, labor, plant utilization, blend rate), and construction costs are detailed in this paper.
Product Details
Published: 01/01/1992 ISBN(s): 0898676509 Number of Pages: 20File Size: 1 file , 640 KB