Planning treated water facilities for the new Denver International Airport has been influenced by several factors. Presented is a discussion of some of the more significant factors: method and area of service; demand estimates (land use, demand, fire flow requirements, conservation, irrigation); engineering standards; (pressure standards, looping standard, sizing method and standards); water system and operation; and costs.
Product Details
Published: 01/01/1991 ISBN(s): 0898675928 Number of Pages: 13File Size: 1 file , 550 KB