Sale! View larger

AWWA ACE91173

New product

AWWA ACE91173 Integrated Layout of Treatment Plant Process Facilities

Conference Proceeding by American Water Works Association, 01/01/1991

Corbin, Darryl; Hoffman, Cynthia; Monk, Robert D.G.; Crumb, S. Frank Jr.

More details

$10.56

-56%

$24.00

More info

Full Description

One of the last steps in the preliminary design of a water treatment plant (WTP) is to develop the plant layout. By this stage of the design process, the site has been selected, the treatment processes identified, and the approximate dimensions of the process units have normally been established. The engineer then faces the task of arranging the process units on the site. There are a number of alternative basic plant layouts. The particular plant layout selected can have a significant impact on construction cost, hydraulics, plant performance, operation and maintenance (O

Product Details

Published: 01/01/1991 ISBN(s): 0898675928 Number of Pages: 24File Size: 1 file , 900 KB