Sale! View larger

AWWA ACE99407

New product

AWWA ACE99407 Achieving Optimized Performance Goals and Treatment Capability From a Small Water Treatment Facility

Conference Proceeding by American Water Works Association, 01/01/1999

Hegg, Bob A.; Adams, Stan; Valentine, Tracy; DeMers, Larry D.

More details

$10.56

-56%

$24.00

More info

Full Description

This paper documents the results of optimization activities that the City of Leavenworth, Washington, conducted at its water treatment plant. The City had never been able to meet the Washinton State Department of Health filtered water turbidity requirements and had received numerous treatment violation notices. Ultimately, the City was faced with a potential plant expansion or replacement project to meet their water demands. As an alternative approach, the City and its consulting engineer developed an action plan to bring the water treatment plant into compliance called the Composite Correction Program, which consisted of two components, the Comprehensive Performance Evaluation and Comprehensive Technical Assistance. Both components were implemented at the Leavenworth facility.

Product Details

Published: 01/01/1999 ISBN(s): 1583210016 Number of Pages: 20File Size: 1 file , 270 KB