M00006811
New product
PIP STS02465 Augered Cast-in-Place Piles Installation Specification [Editorial Correction]
standard by Process Industry Practices, 07/01/2022
In stock
Warning: Last items in stock!
Availability date: 2023-05-27
This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity testing are included and shall be executed in accordance with this specification when required.