M00002482
New product
WRC Volume 45 No. 01-02 1990 Progress Reports Volume 45 No. 01-02 1990
Report / Survey by Welding Research Council, 1990
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 2021-07-28
CONTENTS
- Executive and Main Committee, January 12, 1990
- Continued Operation of Equipment, January 11, 1990
- Joint Tak Force on Non-Metallic Piping Requirements, November 9, 1989
- JPVRC Progress Report - January 1990
- PVRC Project on Review of ASME Nuclear Codes Standards - January 10-11, 1990
- Subcommittee on Repair, Replacement and Modification, January 10-11, 1990
- Design Division, January 12, 1990
- Subcommittee on Piping, Pumps and Valves, January 11, 1990
- Subcommittee on Reinforced Openings and External Loadings, January 11, 1990
- Subcommittee on Dynamic Analysis and Testing, January 11, 1990
- Elevated Temperature Design and Elevated Temperature Behavior of Components, January 10, 1990
- Subcommittee on Shells and Ligaments, January 11, 1990
- Subcommittee on Shells and Ligaments, October 11, 1989
- Materials and Fabrication Division, January 12, 1990
- Subcommittee on Failure Modes Components, January 10, 1990
- Subcommittee on Nondestructive Examination of Components, January 11, 1990
- Subcommittee on Thermal and Mechanical Effects on Materials, January 11, 1990
- Subcommittee on Welds, January 11, 1990
- Materials and Fabrication Division, October 12, 1989
- Subcommittee on Thermal and Mechanical Effects on Materials, October 12, 1989
- Subcommittee on Elevated Temperature Behavior and T/G on Life Extension, October 11, 1989