M00002419
New product
WRC Volume 51 No. 01-02 1996 Progress Reports Volume 51 No. 01-02 1996
Report / Survey by Welding Research Council, 1996
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 2021-07-28
CONTENTS
This volume includes the full Minutes of the Executive Committee, Division on Continued Operation of Equipment and Design Division. The balance of the PVRC Minutes, including those of the Materials and Fabrication Division and Cyclic Life and Environmental Effects, appear in the companion volume, Volume 2.
- Executive Committee, October 11, 1995
- JPVRC Progress Reports
- Joint Task Group on Increased Code Allowable Stresses, October 9, 1995
- Division on Continued Operation of Equipment, October 9, 1995
- Design Division, October 11, 1995
- Committee on Bolted Flanged Connections, October 10, 1995
- Subcommittee on Flange Parameter Study, October 9, 1995
- Subcommittee on Gasket Testing and Elevated Temperature Flange Joint Behavior, October 9, 1995
- Subcommittee on Dynamic Stress Criteria, October 19, 1995
- Committee on Elevated Temperature Design, October 9, 1995
- Committee on Piping and Nozzles, October 9, 1995
- Subcommittee on Flexibility Models and Stress Intensification Factors, June 5, 1995
- Subcommittee on Flexibility Models and Stress Intensification Factors, October 9, 1995
- Subcommittee on Shell Intersections, October 9, 1995
- Task Group on Large Diameter Shell Intersections, October 9, 1995
- Committee on Polymers for Pressure Components, June 6, 1995
- Committee on Polymers for Pressure Components, October 10, 1995
- Committee on Shells and Ligaments, October 9, 1995