M00002426
New product
WRC Volume 51 No. 03-04 1996 Progress Reports Volume 51 No. 03-04 1996
Report / Survey by Welding Research Council, 1996
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 2021-07-28
CONTENTS
This volume includes the full Minutes of the Executive Committee, Division on Continued Operation of Equipment, Design Division and the Steering Committee on Cyclic Life and Environmental Effects in Nuclear Applications. The balance of the PVRC Minutes, including those of the Materials and Fabrication Division, appear in the companion volume, May/June 1996.
- Executive Committee, January 31, 1996
- JPVRC Progress Reports
- Joint Task Group on Increased Code Allowable Stresses, January 29, 1996
- Division on Continued Operation of Equipment, February 2, 1996
- Design Division, January 31, 1996
- Committee on Bolted Flanged Connections, January 30, 1996
- Subcommittee on Flange Parameter Study, January 29, 1996
- Subcommittee on Gasket Testing and Elevated Temperature Flanged Joint Behavior, January 29, 1996
- Committee on Dynamic Analysis and Testing, January 30, 1996
- Subcommittee on Dynamic Stress Criteria, January 30, 1996
- Committee on Elevated Temperature Design, January 30, 1996
- Committee on Piping and Nozzles, January 29, 1996
- Subcommittee on Flexibility Models and Stress Intensification Factors, January 29, 1996
- Subcommittee on Shell Intersections, January 29, 1996
- Task Group on Large Diameter Shell Intersections, January 29, 1996
- Committee on Shells and Ligaments, January 29, 1996
- Steering Committee on Cyclic Life and Environmental Effects in Nuclear Applications, January 30, 1996
- Working Group on S-N Curve Data, January 29, 1996
- Working Group on da/dN Data Analysis, January 30, 1996
- Working Group on Evaluation Methods, January 30, 1996
- Task Group on Weld Evaluation Methods, January 29, 1996